Location
Location
Call Us
Send Email
Building Excellence with Over 15 Years of Industry Expertise
Select a package below and input your project details to get an instant cost estimation.
Branded fittings & modern modular kitchen setup.
Designer interior concepts & premium tile flooring.
World-class luxury interior concepts & home automation.
1. † Items marked as extra/optional will be charged separately based on actual quantity and client approval.
2. Excavation included up to 5 ft depth; beyond 5 ft depth will be charged extra as per site condition.
3. Window size considered maximum 5'×4.5'. Larger sizes / special glazing will be extra.
4. GST is extra as applicable. Government charges/plan approval charges are extra.
5. Rates are indicative; final quotation will be based on drawings, specifications, and site condition.
6. Client to provide/confirm: borewell / BWSSB water source, temporary electricity (or as agreed) and site access for material unloading.
7. Rates assume normal soil condition. Hard rock/loose soil, dewatering, shoring, carting beyond standard lead will be charged extra.
8. Statutory/utility deposits & connections (BESCOM, BWSSB, BBMP/authority charges, meter charges) are excluded unless specifically mentioned.
9. Any additional details/specifications not mentioned here will be executed as per approved drawings, relevant IS codes, and Site Engineer instructions.
10. Warranty/guarantee will be as per manufacturer warranty for materials and as per final agreement for workmanship.
11. In any packages Interiors are not included.
12. Any brand/model selections (tiles, sanitary, fittings, electrical fixtures, paint shade) must be finalized in writing before procurement to avoid delays.
13. Refer Sheet 'Allowances & Selections' for material allowance limits. Selections beyond allowance will be charged extra with client approval.
14. Refer Sheet 'Brand & Make List' for standard brands/specs. Any change in brand/spec will be charged as per actuals (difference only).
15. Use Sheet 'Client Selection Tracker' for written approvals. Procurement/ordering will start only after selection approval to avoid delays.